Learn Everything at One Place !

In an NC machining operation, the tool has to be moved from point...

Q.  
In an NC machining operation, the tool has to be moved from point (5, 4) to point (7, 2) along a circular path with centre at (5, 2). Before starting the operation, the tool is at (5, 4). The G and N codes for this motion are


Answer & Explanation

We want circular motion as mention in question,
G02 - for Circular clockwise circular interpolation.

Thus correct option is: B.


Similar Questions

Start Discussion :






Comments :

More Questions CAD, CAM, and Automation:

Q.  
The tool of an NC machine has to move along a circular arc from (5, 5) to (10, 10) while performing an operation. The centre of the arc is at (10, 5). Which one of the following
NC tool path command performs the above mentioned operation?

A. N010 G02 X10 Y10 X5 Y5 R5

B. N010 G03 X10 Y10 X5 Y5 R5

C. N010 G01 X5 Y5 X10 Y10 R5

D. N010 G02 X5 Y5 X10 Y10 R5


Answer & Explanation

Q.  
Match the following:
P. M05 1. Absolute coordinate system
Q. G01 2. Dwell
R. G04 3. Spindle stop
S. G09 4. Linear interpolation

A. P-2, Q-3, R-4, S-1

B. P-3, Q-4, R-1, S-2

C. P-3, Q-4, R-2, S-1

D. P-4, Q-3, R-2, S-1


Answer & Explanation

Q.  
Process of converting STL file model in to layers is called ______ in RP.

A. chopping

B. slicing

C. cutting

D. trimming


Answer & Explanation

Q.  
In a CNC program block, N02 GO2 G91 X40 Z40, GO2 and G91 refer to

A. circular interpolation in counter clockwise direction and incremental dimension

B. circular interpolation in counter clockwise direction and absolute dimension

C. circular interpolation in clockwise direction and incremental dimension

D. circular interpolation in clockwise direction and absolute dimension


Answer & Explanation

(Click here) Practice More Questions/MCQ on CAD, CAM, and Automation